Design for Six Sigma
Validate Phase
- 1
What validation testing has been completed and what are the results?
- 2
Is there a significant gap between the actual capability and the predicted capability from the DFSS Scorecard?
If so, what are the next steps to bridge that gap?
- 3
What is the gap between current performance and the customer requirements (the CTCs)?
What differences, if any, still remain?
- 4
Has the production system been put under a state of quality control?
What are the capability measures, such as Cp, Cpk and Defects per Unit (DPU)?
- 5
What are the potential problems and/or unintended consequences of the design?
What are the preventative and contingency actions to address them?
- 6
How has all of this information been documented and communicated to the appropriate people (stakeholders, service, training, manufacturing, etc.)?
- 7
Have drawings, sensitivity analyses and associated knowledge been shared and passed on to manufacturing?
- 8
What is the total project benefit in terms of knowledge gain and quantified quality, cost, and delivery measures?